The HFS Team developed full A-E design documents with specifications to enable the award of this design-bid-build (D-B-B) project. The scope included a complete design to modernize and expand the existing 110,146 SF main OR suite, pre-operative area, and post-operative recovery area. The project was expanded to include the full design of anesthesia and operating room administration, a seven-bed pediatric intensive care unit (PICU) with sedation spaces, and consolidation of the central procedure unit consisting of nine procedure rooms and 18 pre-op/phase II recovery bays.  

With the Revit/3D model, doctors and hospital staff were able to really see the designed space and OR layouts before construction, as well as see the proposed equipment placement.  

One of the unique aspects of this project was the development of a transition plan that will keep partial aspects of the OR suite operational during its renovation. 